
Review the SWMS information below before signing this SWMS. If you see any issues or require clarifcation, please contact Luke | 0480457373 | luke@websiteinaweek.studio.
Work details
- Site / work area
- 7 Buildershield Way
- Trade
- Electrician
- Task
- Power point / GPO installation
- HRCW category
- The area has energised electrical installations or services
Responsible person
Identified hazards and risks
- Electric shock from contact with live wires in wall
- Hitting existing cables or pipes when cutting into wall
- Cuts from sharp cable ends or wall edges
- Test 1
Risk control measures
- Isolate circuit and test dead before cutting into wall
- Use cable detector to locate existing services
- Test 2
How controls will be implemented
- Verify isolation before each cut
- Scan wall with detector and mark existing services
- Test 3