Review 7 Buildershield Way - Carpenter / Joiner - Formwork installation SWMS

Review the SWMS information below before signing this SWMS. If you see any issues or require clarifcation, please contact Paul Kelly | 0489 382 192 | paul@buildersrus.com.au.

Work details

Site / work area
7 Buildershield Way
Trade
Carpenter / Joiner
Task
Formwork installation
HRCW categories
  • A person could fall more than 2m
  • There have been structural alterations that require temporary support to prevent collapse

Responsible person

Identified hazards and risks

  • Formwork collapse during or after pour
  • Falls from formwork or scaffold
  • Crush injuries from falling panels
  • Cuts from nails and sharp edges
  • Back strain from lifting heavy panels

Risk control measures

  • Follow engineer design for bracing and props
  • Use fall protection when working above 2m
  • Secure panels to prevent falling during assembly
  • Wear gloves when handling formwork

How controls will be implemented

  • Formwork design approved before starting
  • Props and bracing checked by experienced worker
  • Strip formwork only when concrete has cured
Powered by